I jumped ship for a 40% rate rise and the opportunity to work with some cutting edge tech.
I can just about handle commuting to London twice a week but it turns out I have been lumbered with a micro managing scrum master based in the US with a fondness for scheduling meetings around 5pm UK time which always overrun. I am used to giving a 1 minute max talk during standups but the scum master has a tendency to discuss the most tedious technical details at length.
If nothing changes I can't see me wanting to renew after six months (which by happy coincidence coincides with the IR35 changes next March).
As a new joiner I don't want to rock the boat but this affecting my productivity and that of the entire team.
Has anyone else faced similar issues?
I can just about handle commuting to London twice a week but it turns out I have been lumbered with a micro managing scrum master based in the US with a fondness for scheduling meetings around 5pm UK time which always overrun. I am used to giving a 1 minute max talk during standups but the scum master has a tendency to discuss the most tedious technical details at length.
If nothing changes I can't see me wanting to renew after six months (which by happy coincidence coincides with the IR35 changes next March).
As a new joiner I don't want to rock the boat but this affecting my productivity and that of the entire team.
Has anyone else faced similar issues?
Comment