Not forgetting, of course, the ladies who sewed the space suits together.
- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Reply to: Moon Landings
Collapse
You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:
- You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
- You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
- If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.
Logging in...
Previously on "Moon Landings"
Collapse
-
-
Originally posted by NickFitz View PostInterview with Margaret Hamilton, the woman in charge of the Apollo software: Margaret Hamilton: ‘They worried that the men might rebel. They didn’t’ | Technology | The Guardian
Leave a comment:
-
Originally posted by darmstadt View Post
Leave a comment:
-
Interview with Margaret Hamilton, the woman in charge of the Apollo software: Margaret Hamilton: ‘They worried that the men might rebel. They didn’t’ | Technology | The Guardian
Leave a comment:
-
Originally posted by clearedforlanding View PostYou forgot Lemmy
Leave a comment:
-
Originally posted by NotAllThere View PostPerhaps you're thinking of Project Orion.
Ship diameter (meters): 100 m
Mass of empty ship (tonnes): 100,000 (incl. 50,000 structure+payload)
+Number of bombs = total bomb mass (each 1 Mt bomb weighs 1 tonne): 300,000
=Departure mass (tonnes): 400,000 t
Maximum velocity (kilometers per second): 10,000 km/s (=3.3% of the speed of light)
Mean acceleration (Earth gravities): 1 g (accelerate for 10 days)
Time to Alpha Centauri (one way, no slow down): 133 years
Estimated cost: 0.1 year of U.S. GNP(1968) which is about $500 billion today.
So it could be done technically. But not 20%c.
In other words, interstellar propulsion technology would have to reach a stable plateau, with little prospect of much improvement, before anyone bothered committing themselves.
Seems pretty reasonable, but I don't think it takes into account the sheer number of possible destinations the further you are willing to go (e.g. hundreds of solar systems even at modest distances such as within a dozen or so light years) and the competition to reach the best ones first or perhaps to escape from some stifling or oppressive regime(s) within the Solar System.
Leave a comment:
-
Originally posted by WTFH View Post
We've lost:
Western Black Rhino, Northern White Rhino, Northern Sumatran Rhino, Alaotra Grebe, Japanese River Otter, Formosan Clouded Leopard, Bermuda Saw-whet Owl, Golden Toad, Hawaiian Crow, Pyrenean Ibex, Spix Macaw, Liverpool Pigeon, Black Faced Honeycreeper, Yangtze River dolphin, Holdridge Toad, ...I could go on, and there's more that are only "Possibly extinct"... Table 9
Leave a comment:
-
Originally posted by DoctorStrangelove View PostYes.
And stayed up until 04:00 watching the "One small step for Man".
Next.
Leave a comment:
-
Originally posted by BrilloPad View PostI am sure I read in new scientist a while ago about tentative plans for a craft that could travel at 20% the speed of light?
Ship diameter (meters): 100 m
Mass of empty ship (tonnes): 100,000 (incl. 50,000 structure+payload)
+Number of bombs = total bomb mass (each 1 Mt bomb weighs 1 tonne): 300,000
=Departure mass (tonnes): 400,000 t
Maximum velocity (kilometers per second): 10,000 km/s (=3.3% of the speed of light)
Mean acceleration (Earth gravities): 1 g (accelerate for 10 days)
Time to Alpha Centauri (one way, no slow down): 133 years
Estimated cost: 0.1 year of U.S. GNP(1968) which is about $500 billion today.
So it could be done technically. But not 20%c.
Leave a comment:
-
Followed all the Moon Landings, within the constraints of school attendance. Fortunately, there was no school as 21 July was start of the summer hols so was allowed to stay up and watch the whole EVA. Depending where in the world you were, the official landing date for Apollo 11 is 20 July EDT or 21 July BST.
It was kind of disappointing because the picture quality wasnt very good plus with it being a static camera, Armstrong and Aldrin were out of shot a lot!
Subsequent investigation shows this poor picture quality down to slow scan 10 FPS camera and the picture being split off once on Earth, one to a data recorder with the other to a then 'high' resolution monitor from which a tv camera was plonked in front of to beam around the world.
Drives me nuts all these Moon Landing deniers, they are every bit as bad as flattards. Saw a YT vid the other day, some guy giving a talk at a conference claimed it wasnt possible to beam live pictures 'from the Moon around the world' because of the lack of power available on the Moon.
It's typical of the misinformation and downright lies the deniers spout. The pictures were not beamed 'live around the world from the Moon.' They were beamed to Parkes and Goldridge(?) then sent around the world from here on Earth.
D'oh!
Leave a comment:
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- Five tax return mistakes contractors will make any day now… Jan 9 09:27
- Experts you can trust to deliver UK and global solutions tailored to your needs! Jan 8 15:10
- Business & Personal Protection for Contractors Jan 8 13:58
- ‘Four interest rate cuts in 2025’ not echoed by contractor advisers Jan 8 08:24
- ‘Why Should We Hire You?’ How to answer as an IT contractor Jan 7 09:30
- Even IT contractors connect with 'New Year, New Job.' But… Jan 6 09:28
- Which IT contractor skills will be top five in 2025? Jan 2 09:08
- Secondary NI threshold sinking to £5,000: a limited company director’s explainer Dec 24 09:51
- Reeves sets Spring Statement 2025 for March 26th Dec 23 09:18
- Spot the hidden contractor Dec 20 10:43
Leave a comment: