- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
test please delete
Collapse
This is a sticky topic.
X
X
Collapse
-
-
Comment
-
The sheer excitement of it all... Eddie & Mike have dug up a hu-man skull... an everyday story of country folk... Straw Dogs more like...Comment
-
-
-
Comment
-
Originally posted by zeitghost View PostThe sheer excitement of it all... Eddie & Mike have dug up a hu-man skull... an everyday story of country folk... Straw Dogs more like...
I've spent a large part of the day reading The Motorway Archive: The online encyclopaedia of UK motorway heritage.
Specimen of the text:
-- The Mid-Wirral Motorway M53
The works commenced in July 1969 and included the construction of four interchanges at Moreton, Woodchurch, Clatterbrige and Hooton, along its 9 mile length.
The site investigations along the route had shown predominantly Glacial Boulder Clay overlying Pebble Beds and Bunter Sandstone with some Keuper Marl at the northern end. Low-lying ground in the Fender Valley has deposits of soft peaty clay and silt up to 25 feet thick.
It was recognised at the design stage that, for a length of one mile between Upton Road and Woodchurch, the soil was low-quality alluvium of considerable depth and that special requirements should be specified. These included pre-drainage, the restriction of heavy plant, dry-weather operations only, and the use of selected materials. All material, whether in cuttings or under future embankments was removed for 2 feet 6 inches below formation level and replaced with rock layers.
In the areas of severed land inside the loops of the Moreton Spur connecting roads, the Contractor excavated borrow pits which were reinstated with unsuitable material.
Comment
-
Originally posted by NickFitz View PostYou want excitement?
I've spent a large part of the day reading The Motorway Archive: The online encyclopaedia of UK motorway heritage.
Specimen of the text:
-- The Mid-Wirral Motorway M53
The works commenced in July 1969 and included the construction of four interchanges at Moreton, Woodchurch, Clatterbrige and Hooton, along its 9 mile length.
The site investigations along the route had shown predominantly Glacial Boulder Clay overlying Pebble Beds and Bunter Sandstone with some Keuper Marl at the northern end. Low-lying ground in the Fender Valley has deposits of soft peaty clay and silt up to 25 feet thick.
It was recognised at the design stage that, for a length of one mile between Upton Road and Woodchurch, the soil was low-quality alluvium of considerable depth and that special requirements should be specified. These included pre-drainage, the restriction of heavy plant, dry-weather operations only, and the use of selected materials. All material, whether in cuttings or under future embankments was removed for 2 feet 6 inches below formation level and replaced with rock layers.
In the areas of severed land inside the loops of the Moreton Spur connecting roads, the Contractor excavated borrow pits which were reinstated with unsuitable material.
Bazza gets caught
Socrates - "The only true wisdom is in knowing you know nothing."
CUK University Challenge Champions 2010Comment
-
Originally posted by RichardCranium View PostHello, everybody peeps.
Wavey wave.
Assuming there's anybody here, of course.Comment
-
Originally posted by zeitghost View PostBazza gets caught
Socrates - "The only true wisdom is in knowing you know nothing."
CUK University Challenge Champions 2010Comment
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- Reeves sets Spring Statement 2025 for March 26th Yesterday 09:18
- Spot the hidden contractor Dec 20 10:43
- Accounting for Contractors Dec 19 15:30
- Chartered Accountants with MarchMutual Dec 19 15:05
- Chartered Accountants with March Mutual Dec 19 15:05
- Chartered Accountants Dec 19 15:05
- Unfairly barred from contracting? Petrofac just paid the price Dec 19 09:43
- An IR35 case law look back: contractor must-knows for 2025-26 Dec 18 09:30
- A contractor’s Autumn Budget financial review Dec 17 10:59
- Why limited company working could be back in vogue in 2025 Dec 16 09:45
Comment