• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!

Thinking outloud - getting round the new PSC rules

Collapse
X
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

    #31
    Originally posted by northernladuk View Post
    Just more guesswork and fantasy with no basis or actual argument as usual. It's getting very tedious and taking more time to correct his statements than it is to focus on the actual topic. #nothelping.
    It is guesswork, which is what we are all doing.

    As I mentioned previously, I have seen such arguments in the past and former colleagues are still thinking/hoping to "hide" via different frameworks and delivery models.

    I don't do anything to do with training, but I did want to stimulate some discussion about what constitutes a material as HMRC have not yet defined. You don't HAVE to be involved in every thread you know....so if you don't want to discuss something you don't have to feel the need to shut it down. You can just abstain.

    Finally, you can't correct an opinion, you can challenge it but it is not yours to correct 😉. I know you have your friends and enemies on here but it doesn't mean that your friends are always correct and your enemies incorrect - except when it comes to PC of course (I'm only kidding PC!)

    Comment


      #32
      Originally posted by youngguy View Post
      It is guesswork, which is what we are all doing.
      But it's not. We have consultation document, we know what we do and we have some varied experience of delivering to Public Sector. We should be looking at solutions using these facts to put something together that fits them all. It's not guesswork. That's what you are doing without any further thought.

      I just see a cycle where you make a sweeping statement, bet, guess and end up correcting it and explain to you why rather than actually putting something tangible like eek is trying to do.
      'CUK forum personality of 2011 - Winner - Yes really!!!!

      Comment


        #33
        Originally posted by northernladuk View Post
        But it's not. We have consultation document, we know what we do and we have some varied experience of delivering to Public Sector. We should be looking at solutions using these facts to put something together that fits them all. It's not guesswork. That's what you are doing without any further thought.

        I just see a cycle where you make a sweeping statement, bet, guess and end up correcting it and explain to you why rather than actually putting something tangible like eek is trying to do.
        We do have a document. It does not define things such as materials , hence eek's Q. We have seen from the past definitions are critical to all of this with the BETs and MOO, SDC etc.

        I don't see my statement as sweeping. Previously I have seen people dodge rules and right now I am hearing people looking at similar approaches.

        Eek put out a vague open thought (which I personally have no issue with) where he was thinking about how he could 'circumvent' one of the rules, which led to a debate about what we think that means. From some posters it suggests there is some difference of opinion on what a material would be based upon when it is created etc.

        We could have said to eek "who knows, pointless Q without detail, its your specific situation, AYCOTBAC if you can't decide about your own business " but that would be neither helpful nor true. I thought eek's post was useful and relevant BUT if I hadn't, I would have ignored it and got on with my day as I don't own this forum, not everyone needs to share my view, I don't take it personally, I'm not 'on an ego trip and I don't see any value in attacking forum members. 😀

        Comment


          #34
          I agree with the view that it's worth waiting for the details, because there could be significant changes at the level of granularity about what constitutes a "material" and what proportion of the contract value might be appropriate. This is really down in the weeds w/r to the wider significance of these measures, although I appreciate that the OP understands this. It's also worth bearing in mind that, in the presence of continuing ambiguity, the default position by most clients and agents would be to minimize risk.

          That being said, I think it would be difficult to argue that a material is anything other than a "raw input" to a service being delivered (an input which may or may not be consumed during the delivery), and would not extend to that part of an output in which some value had been added to the raw material. For example, it may be possible to argue that a particular off-the-shelf framework (COTS) was an input cost (material). However, in improving that framework and delivering it, the "value-add" would not be part of the material cost. In practice, I can envisage very few cases involving the delivery of knowledge-services where the materials would account for a significant fraction of the delivery.

          Comment


            #35
            Originally posted by jamesbrown View Post
            I agree with the view that it's worth waiting for the details, because there could be significant changes at the level of granularity about what constitutes a "material" and what proportion of the contract value might be appropriate. This is really down in the weeds w/r to the wider significance of these measures, although I appreciate that the OP understands this. It's also worth bearing in mind that, in the presence of continuing ambiguity, the default position by most clients and agents would be to minimize risk.

            That being said, I think it would be difficult to argue that a material is anything other than a "raw input" to a service being delivered (an input which may or may not be consumed during the delivery), and would not extend to that part of an output in which some value had been added to the raw material. For example, it may be possible to argue that a particular off-the-shelf framework (COTS) was an input cost (material). However, in improving that framework and delivering it, the "value-add" would not be part of the material cost. In practice, I can envisage very few cases involving the delivery of knowledge-services where the materials would account for a significant fraction of the delivery.
            This +1.

            Obviously, as a product specialist I have many materials, as well as thousands of my authored (not CUK) forum posts as a specialist in "my" technology.
            Of course this very extensive library of information gets regularly used, but I totally agree with JB on this point.
            The Chunt of Chunts.

            Comment


              #36
              Originally posted by jamesbrown View Post
              However, in improving that framework and delivering it, the "value-add" would not be part of the material cost.
              I'm curious on that point as the one thing I know all the specialist consultancies are trying to develop, at the moment, is as much intellectual property / "build blocks" / "starting points" as possible to differentiate themselves from the competition and reduce total development time....
              Last edited by eek; 7 September 2016, 16:33. Reason: changed cost to time because...
              merely at clientco for the entertainment

              Comment


                #37
                Originally posted by eek View Post
                I'm curious on that point as the one thing I know all the specialist consultancies are trying to develop, at the moment, is as much intellectual property / "build blocks" / "starting points" as possible to differentiate themselves from the competition and reduce total development time....
                Sure, but that's a business strategy for reducing costs/maximizing profits, not a basis for defining a material (input) cost in terms of the question in the consultation:

                "Is 20% or more of the contract for materials consumed in the service?"

                My point is that, IMHO, YourCo licensing a product that amounts to >=20% of the contract value is not going to qualify as a "material consumed in the service" based on the phrasing and examples given (and is, of course, a very rare situation for most PS contracts for knowledge services that are delivered by "PSCs"). I think you're arguing that it might be. It might be. My main point is that it's a very rare situation anyway.

                Comment


                  #38
                  Originally posted by eek View Post
                  Now my plan for getting round the new PSC rules is very simple. Write code, creating a set of packages that I can sell to others and stop being a bum on seat contractor but I've been thinking (dangerous I know).

                  The one get out clause in the new PSC rules is where materials are provided and those materials make up over 20% of the value of the project - this gives me an idea.

                  Now the question is would the following work...

                  1) licence some of the packages (discussed above) on a per developer licence - using the bits that save developers large amounts of time by removing the need to develop a lot of custom code.
                  2) provided a means for live production licences to be resold based on the complexity of the project (say at 20-25% of the contract cost)...
                  3) ideally pocket a bit of 2 for myself....

                  Anyone care to comment...
                  The way I am going to deal with it is take my much sought after experience and skills to the private sector as will most good contractors, leaving the public sector with 3rd rate cowboys, then watch as their system crumble costing millions to the taxpayer. Whoever came up with this one needs sectioned.

                  Comment


                    #39
                    Originally posted by Unix View Post
                    The way I am going to deal with it is take my much sought after experience and skills to the private sector as will most good contractors, leaving the public sector with 3rd rate cowboys, then watch as their system crumble costing millions to the taxpayer. Whoever came up with this one needs sectioned.
                    I certainly agree with the crumbling system. I also wonder how the overall market will handle up to 26,000 contractors seeking work in the private sector.

                    Cowboys may possibly be left yes, the less experienced plus those career path contractors who may struggle to get past agencies with Gov centric CVs.

                    Comment


                      #40
                      Originally posted by Unix View Post
                      The way I am going to deal with it is take my much sought after experience and skills to the private sector as will most good contractors, leaving the public sector with 3rd rate cowboys, then watch as their system crumble costing millions to the taxpayer. Whoever came up with this one needs sectioned.
                      <HMRC Thinking>Hmmm - we need to get people back from the private sector into the public sector. I know - let's extend this to private sector and they will come back!</HMRC Thinking>

                      Comment

                      Working...
                      X