Originally posted by zeitghost
I witnessed one take out a pair of expensive clientco disk controllers.
I had noticed them testing the diesel generator as I arrived that morning. I should have switched the computers off before they did any damage.
And at another site, a shiny new UPS was being installed.
Something went wrong and it took the power out for the entire building.
The halon dumped too.
And they weren't allowed to replace the halon, so that meant replacing that system as well.