Originally posted by NotAllThere
View Post
Either way it's a murky area and not one I'd like to be sat in for very long. And similar to Sue Ellen's point, what do you dispute without a written contract. Although I'd take her comment one stage further and say that as the OP new supplier hasn't offered a contract then the default acceptance by being onsite is also very murky.
The old supplier are no longer contracted, and no new contract offered I'd say there's no implied contract at all.