This October furlough (not Christmas) is (they claim) due to the drop in sales in China (down 46%). They have moved close to 2,000 workers onto a 3 day week.
JLR announces two-week shutdown of Solihull plant The Engineer
They are also moving 100% of Discovery production to Slovakia.
They currently have the i-pace (electric), which is manufactured by Magna-Steyr in Austria.
They don't produce electric cars in the UK.
They have committed to only produce electric or hybrid cars by 2020.
JLR announces two-week shutdown of Solihull plant The Engineer
They are also moving 100% of Discovery production to Slovakia.
They currently have the i-pace (electric), which is manufactured by Magna-Steyr in Austria.
They don't produce electric cars in the UK.
They have committed to only produce electric or hybrid cars by 2020.
Comment