Originally posted by Lost It
View Post
- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Collapse
You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:
- You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
- You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
- If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.
Logging in...
Previously on "Getting Quotes in for building work - with or without materials"
Collapse
-
-
Let them supply labour and materials. At the end of the job there will be a breakdown, anything they use has to be notified to you as the client. CDM rules changed in 2015, have a quick look through them to see if they affect you?
They were chnaged mainly because of all these house SOS build programs showing builders doing really dodgy things with lintels and RSJ's... IMHO, I used to cringe when I saw them knocking block out with no acro's in place...
Free download.
Construction (Design and Management) Regulations 2015
Leave a comment:
-
Originally posted by DimPrawn View PostAny decent builder will be busy for the next decade and be charging £500/day.
If not they are not worth hiring.
Leave a comment:
-
Originally posted by northernladyuk View PostDidn't the first former Mrs BP give you building cladding for Christmas?
Leave a comment:
-
Originally posted by northernladyuk View PostHow does it work out if you have a contractual dispute post-payment? Is it pick axe handle time?
You still have to choose a really good builder in the first place.
The way you arrange the finances shouldn't change that.
Leave a comment:
-
Originally posted by MrMarkyMark View PostThe point I alluded was alluding too earlier was even VAT Inspectors have asked my old man for an "ex-VAT price"
He said the guy seemed totally serious.
Needless to say, he suggested he "Didn't operate on such a basis"
(Maybe you should do the same, if you have plenty of cash available, that's the way to save real money )
Leave a comment:
-
Originally posted by BrilloPad View PostThat only happens with cladding on tower blocks....
Leave a comment:
-
Offer Cash Payment
The point I alluded was alluding too earlier was even VAT Inspectors have asked my old man for an "ex-VAT price"
He said the guy seemed totally serious.
Needless to say, he suggested he "Didn't operate on such a basis"
(Maybe you should do the same, if you have plenty of cash available, that's the way to save real money )
Leave a comment:
-
I suppose the other side is that if they supply materials you want to know they're not over-charging you for them and/or charging you for top-spec and buying cheap crap.
Leave a comment:
-
The Real Way to Save Real Money.
I assume I can get "trade prices" using MyCo's registration details at most big firms, it is more hassle than its worth to save a few quid or can the savings add up
No income tax, no VAT..........
Please note that is your good self on the right
Leave a comment:
-
unless there is a really significant cost saving i.e. you can source X amount of reclaimed bricks for peanuts via a friend or your uncle owns an insulation factory I wouldn't bother far too much hassle.We have sourced stuff for builders where we wanted to choose e.g. sinks / lights but a few times it has been hard work when they arrived, builders didn't like them /had plumbed etc. incorrectly for them (we had shown them & printed the instructions out.)
Maybe price the materials up personally and compare to their quote?
Leave a comment:
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- Streamline Your Retirement with iSIPP: A Solution for Contractor Pensions Sep 1 09:13
- Making the most of pension lump sums: overview for contractors Sep 1 08:36
- Umbrella company tribunal cases are opening up; are your wages subject to unlawful deductions, too? Aug 31 08:38
- Contractors, relabelling 'labour' as 'services' to appear 'fully contracted out' won't dupe IR35 inspectors Aug 31 08:30
- How often does HMRC check tax returns? Aug 30 08:27
- Work-life balance as an IT contractor: 5 top tips from a tech recruiter Aug 30 08:20
- Autumn Statement 2023 tipped to prioritise mental health, in a boost for UK workplaces Aug 29 08:33
- Final reminder for contractors to respond to the umbrella consultation (closing today) Aug 29 08:09
- Top 5 most in demand cyber security contract roles Aug 25 08:38
- Changes to the right to request flexible working are incoming, but how will contractors be affected? Aug 24 08:25
Leave a comment: