• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Collapse

You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:

  • You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
  • You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
  • If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.

Previously on "Contract Extensions and Length"

Collapse

  • d000hg
    replied
    Originally posted by suityou01 View Post
    It's heavy lifting apparently.
    He probably is the guy who has to build the desks and chairs for us important people to use.

    Leave a comment:


  • suityou01
    replied
    It's heavy lifting apparently.

    Leave a comment:


  • d000hg
    replied
    Originally posted by zeitghost
    Really?

    I've designed entire products in 3 months.
    3 months to DESIGN it? Blimey, that's a long time.

    Leave a comment:


  • suityou01
    replied
    Originally posted by SueEllen View Post
    MF leave suity alone.
    You are the best

    Leave a comment:


  • FatLazyContractor
    replied
    Originally posted by nigelsousa View Post

    To which group do you think suityou01 belongs?
    The Chosen One

    Leave a comment:


  • alreadypacked
    replied
    Boomed, just got extended for 6 month, with a possibality of another 6 months.

    the 3 months on the beach just got cancelled, but the penthouse apartment is on the cards

    Leave a comment:


  • SueEllen
    replied
    Originally posted by nigelsousa View Post
    Very good connies can jump around with no CV damage. Their rep wins.

    Average and below connies cannot.

    To which group do you think suityou01 belongs?

    Ps. I include myself in the group that cannot jump around too much
    MF leave suity alone.

    Leave a comment:


  • nigelsousa
    replied
    Originally posted by NickFitz View Post
    WtheGALS.

    My current gig is six weeks. It's perfectly serious, in that it's something the client needs and it'll take about that much time to do.

    Over the last fifteen years of contracting I've had gigs that have lasted a few weeks, and ones that have lasted a couple of years. None of it seems to make any difference in terms of getting further gigs.
    Very good connies can jump around with no CV damage. Their rep wins.

    Average and below connies cannot.

    To which group do you think suityou01 belongs?

    Ps. I include myself in the group that cannot jump around too much
    Last edited by nigelsousa; 14 November 2014, 14:33.

    Leave a comment:


  • NickFitz
    replied
    Originally posted by zeitghost
    Originally posted by nigelsousa View Post
    You can't do anything serious in 3 months.

    Are you tinkering?
    Really?

    I've designed entire products in 3 months.
    WtheGALS.

    My current gig is six weeks. It's perfectly serious, in that it's something the client needs and it'll take about that much time to do.

    Over the last fifteen years of contracting I've had gigs that have lasted a few weeks, and ones that have lasted a couple of years. None of it seems to make any difference in terms of getting further gigs.

    Leave a comment:


  • nigelsousa
    replied
    Originally posted by suityou01 View Post
    Yep. Competent people can get a lot done in 3 months. Are you tinkering?
    Leave the heavy lifting to the men.

    Nothing serious can be built in 3 months. That is not to say nothing can be built in 3 months. I'm saying, nothing of reasonable complexity in a bank can be built in 3 months.

    Your CV implies baby tasks linking other systems (that the men are working on.) This is mechanical grunt work. Drag and drop.

    Leave a comment:


  • Gaz_M
    replied
    People not understanding short term contracts don't understand contracting imo.

    There's a woman at our place (contractor PM) who said she wouldn't look at a developer's CV if they didn't stay in a role for at least 12 months - I gave her a right mouthful and told her to get out of contracting if that was the depth of her knowledge.

    Leave a comment:


  • suityou01
    replied
    Yep. Competent people can get a lot done in 3 months. Are you tinkering?

    Leave a comment:


  • BrilloPad
    replied
    Its not size that counts its quality.

    HTH

    Leave a comment:


  • jmo21
    replied
    Originally posted by scooterscot View Post
    Not great if you're a permie. As a contractor / freelancer, it says nothing. Demand is a good thing.
    For some types of role maybe. Said similar on another thread yesterday.

    If I was hiring a developer or PM, I wouldn't be too interested in someone with lots of really short contracts - definite red flag for me.

    Leave a comment:


  • nigelsousa
    replied
    Short dev gigs

    You can't do anything serious in 3 months.

    Are you tinkering?