What do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Completing to early
Collapse
X
-
-
-
Why do you think we're all here???Originally posted by DiestlWhat do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
The squint, the cocked eye and clenched first are the cornerstones of all Merseyside communication from birth to graveComment
-
In my first contract I'd done the job in a week. It was a 3 month contract and I called my agent to say that I didn't think I could string it out for the whole 3 months. The agent, of course, told me to never let them know.Originally posted by DiestlWhat do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
In the end I stayed there for 18 months, picked up a load of new skills, got some very usefull contacts and have done two direct contracts with them over the past few years.Comment
-
Write documentation.Originally posted by DiestlWhat do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
Copious documentation.Insanity: repeating the same actions, but expecting different results.
threadeds website, and here's my blog.
Comment
-
Originally posted by DiestlWhat do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
Try and read every single post on the "test please delete"!!!Comment
-
Relax. Try to think about something else to take your mind off it. And if you can't, remember it happens to all men at some point.
Oh sorry, we weren't talking about that were we?Will work inside IR35. Or for food.Comment
-
'What do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?',
why do you think this site exists and what is everyone doing here ?
longest period with absolutely nout to do on a contract for me has been about 7 months !
Milan.Comment
-
Comment
-
Go to the gents and whack yourself offOriginally posted by DiestlWhat do you guys do if you get way ahead in a project and still have months left (if the clients non the wiser what stage you are at)?
Comment
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- Luke’s Story: “I knew it was a loan. But they changed the rules.” Today 00:00
- I registered my company with my home address. Whoops. Here's what Companies House shows the world about you Yesterday 13:06
- The Tories’ three IR35 replacement options — but contractors are right to be sceptical Yesterday 03:51
- Conservatives to replace IR35 outright, Griffith vows — advisers who met him reveal what it should contain Sep 21 05:06
- HMRC’s tax calculation errors: why contractors must check their bill now Sep 17 05:14
- HMRC names 12 loan charge-type schemes, one with ‘Tardis’ clause Sep 15 00:12
- Inside IR35 contractors as zero-hours reform victims is why Kate Dearden must meet us Sep 14 06:37
- Simple Assessment letters: How ex-Personal Service Companies are on HMRC’s radar Sep 11 12:16
- HMRC leaves 37,000 contractors’ nil-liability question in the air Sep 11 07:42
- Pay 2% to protect a ‘loan’. Settle it for 1–2%? The contractor debt mystery deepens Sep 10 06:30


Comment