Stated at 05:30.
Drove 500km.
Only problem was gawkers at a crash site on the opposite direction. (A car had jumped over the guard rain , turned up side down and caught fire)
Total of 15 km roadworks where the are only 2 lanes and a limit of 80 km/h.
The gridlock at the Basel border was as usual.
Biggest problem was finding a parking spot on arrival.
Total travel time including 2 breaks was 6 hours flat.
Will collect 150 EUR in "mileage" compensation for this morning. Spent 80 EUR on filling up with petrol once entered CH.
Getting plenty of coffee now.
- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Reply to: M62 this morning…
Collapse
You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:
- You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
- You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
- If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.
Logging in...
Previously on "M62 this morning…"
Collapse
-
Originally posted by eek View PostWell thats because the A1(M) is an important road. The M62 has a decent diversion route called the A66 especially if you want to avoid the A1(M).
Certainly didn't help anyone that wanted to exit at jn26
Leave a comment:
-
Originally posted by Spacecadet View Postwhy were you leaving the house at 5.35am?
Because of the average speed cameras, and needing to leave even earlier, plus the need to bank some time to get to my Friday evening commitment, I am having to leave arond the 5:45 mark just to get to work before 7.
No sign of the problems on the BBC travel website from my blackberry, nor from the AA travelwatch number. Had I known I would have come off at Halifax when the motorway ground to a halt, with the next exit after it goes down to just the one lane.
Leave a comment:
-
Originally posted by Churchill View PostWhat mismanagement are we talking about? The fact that you choose to commute over the highest stretch of motorway above sea-level in Britain on a daily basis?
Tough-Sh!t Sherlock!
What doggie said. If you want to blame someone, at least blame the Bobs.
Leave a comment:
-
Originally posted by Bunk View PostWonder who that wasOriginally posted by Wilmslow View PostOver-running roadworks.
I left home at 5:35am, made it to the office, 56 miles from home at 8am.
Two and a half hour commute due to being stranded for over an hour for the 5 miles between Halifax and Brighouse. 12 Mile stationery traffic built up behind me within half an hour.
Three lanes down to one lane for overnight roadworks rocking into 8am on a busy Monday morning.
Did anyone else fall victim to this shining example of car mis-management?
Leave a comment:
-
Originally posted by the_rangdo View PostYes!
TrafficEngland showed no particular issues (speed information not available), Highways Agency only mentioned a single stranded vehicle (just before the 2 lane shut-down) and all the matrix signs prior to the shut-down mentioned the A1(M).
The only official warning of the M62 being fubarred was 800m before it narrowed.
Leave a comment:
-
Originally posted by the_rangdo View PostYes!
TrafficEngland showed no particular issues (speed information not available), Highways Agency only mentioned a single stranded vehicle (just before the 2 lane shut-down) and all the matrix signs prior to the shut-down mentioned the A1(M).
The only official warning of the M62 being fubarred was 800m before it narrowed.
Leave a comment:
-
Originally posted by Wilmslow View PostOver-running roadworks.
I left home at 5:35am, made it to the office, 56 miles from home at 8am.
Two and a half hour commute due to being stuck for over an hour for the 5 miles between Halifax and Brighouse. 12 Mile stationery traffic built up within half an hour.
Three lanes down to one lane for overnight roadworks rocking into 8am on a busy Monday morning.
Did anyone else fall victim to this shining example of mis-management?
TrafficEngland showed no particular issues (speed information not available), Highways Agency only mentioned a single stranded vehicle (just before the 2 lane shut-down) and all the matrix signs prior to the shut-down mentioned the A1(M).
The only official warning of the M62 being fubarred was 800m before it narrowed.
Leave a comment:
-
Originally posted by Wilmslow View PostOver-running roadworks.
I left home at 5:35am, made it to the office, 56 miles from home at 8am.
Leave a comment:
-
Left home at 6:00am this morning, arrived at 8:45am after a 300km drive through temperatures of up to -18, ice and frost on the road and plenty of roadworks. This is on a motorway which is primarily 2 lanes with a few 100 - 130 zones (so no real speeding), lots of up and down and twists and turns and high bridges over valleys and what seems to be a lot of total ****wit Audi and Ford drivers. Extremely good going this morning.
Leave a comment:
-
Originally posted by Churchill View PostWhat mismanagement are we talking about? The fact that you choose to commute over the highest stretch of motorway above sea-level in Britain on a daily basis?
Tough-Sh!t Sherlock!
If you are going to take low paid, low powered permie position, at least FFS, choose one a few short miles from home!
Leave a comment:
-
Well am over 250 miles away in Surrey and even I heard on the radio that the roadworks over ran
Leave a comment:
-
Originally posted by Wilmslow View PostOver-running roadworks.
I left home at 5:35am, made it to the office, 56 miles from home at 8am.
Two and a half hour commute due to being stuck for over an hour for the 5 miles between Halifax and Brighouse. 12 Mile stationery traffic built up within half an hour.
Three lanes down to one lane for overnight roadworks rocking into 8am on a busy Monday morning.
Did anyone else fall victim to this shining example of mis-management?
Tough-Sh!t Sherlock!
Leave a comment:
-
M62 this morning…
Over-running roadworks.
I left home at 5:35am, made it to the office, 56 miles from home at 8am.
Two and a half hour commute due to being stuck for over an hour for the 5 miles between Halifax and Brighouse. 12 Mile stationery traffic built up within half an hour.
Three lanes down to one lane for overnight roadworks rocking into 8am on a busy Monday morning.
Did anyone else fall victim to this shining example of mis-management?Tags: None
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- Five tax return mistakes contractors will make any day now… Yesterday 09:27
- Experts you can trust to deliver UK and global solutions tailored to your needs! Jan 8 15:10
- Business & Personal Protection for Contractors Jan 8 13:58
- ‘Four interest rate cuts in 2025’ not echoed by contractor advisers Jan 8 08:24
- ‘Why Should We Hire You?’ How to answer as an IT contractor Jan 7 09:30
- Even IT contractors connect with 'New Year, New Job.' But… Jan 6 09:28
- Which IT contractor skills will be top five in 2025? Jan 2 09:08
- Secondary NI threshold sinking to £5,000: a limited company director’s explainer Dec 24 09:51
- Reeves sets Spring Statement 2025 for March 26th Dec 23 09:18
- Spot the hidden contractor Dec 20 10:43
Leave a comment: