Originally posted by northernladuk
View Post
- Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
- Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Reply to: AI
Collapse
You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:
- You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
- You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
- If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.
Logging in...
Previously on "AI"
Collapse
-
-
What kind of dog can do magic?
Dogs cannot perform magic in the way humans often imagine it, with tricks and illusions. Magic is typically a form of entertainment that involves skilled magicians performing illusions and sleight of hand to create the appearance of supernatural or unexplainable phenomena.
However, some dogs can be trained to perform tricks or behaviors that might appear magical to onlookers. These tricks are typically based on training and commands, not actual magical abilities. For example, some dogs can be trained to fetch specific objects, perform agility courses, or even appear to read cue cards or respond to hand signals. These tricks are the result of diligent training and the dog's ability to follow commands from their owner or trainer.
So, while dogs can be incredibly talented and perform impressive feats through training, their abilities are not magical but rather a result of their intelligence and the training they've received.
Leave a comment:
-
Can't do humour with AI it seems
If it takes 10 men 6 hours to dig a hole, how many men does it take to dig the same hole?
The number of men required to dig a hole depends on several factors, including the size of the hole, the type of soil or material being dug, and the tools and equipment being used. However, if we assume that all these factors remain constant and only the time available for digging changes, we can use the concept of man-hours to calculate the number of men required.
If it takes 10 men 6 hours to dig a hole, they are collectively doing 10 men * 6 hours = 60 man-hours of work.
So, if you want to dig the same hole in a different amount of time, you can use the following formula to calculate the number of men needed:
Number of Men = Total Man-Hours / Time (in hours)
For example, if you want to dig the same hole in 3 hours, you would calculate:
Number of Men = 60 man-hours / 3 hours = 20 men
So, it would take 20 men to dig the same hole in 3 hours if all other factors remain constant. If you want to dig the hole in a different amount of time, you can use this formula to calculate the required number of men accordingly.
Leave a comment:
-
Originally posted by Paddy View PostQ
Tell me, if it takes one hour to dry three towels on an outside 10 metre washing line, how long will it take to dry six towels.
Ans
Assuming all the towels are of the same size, it would take 2 hours to dry 6 towels on the washing line. Here's why: if it takes 1 hour to dry 3 towels, that means you can dry 1 towel in 1/3 of an hour or 20 minutes. Therefore, to dry 6 towels, you would need 6 times as long, which is 6 x 20 minutes = 120 minutes or 2 hours
Incidentally, AI is supposed to mimic human thinking? That answer does that.
Leave a comment:
-
AI
Q
Tell me, if it takes one hour to dry three towels on an outside 10 metre washing line, how long will it take to dry six towels.
Ans
Assuming all the towels are of the same size, it would take 2 hours to dry 6 towels on the washing line. Here's why: if it takes 1 hour to dry 3 towels, that means you can dry 1 towel in 1/3 of an hour or 20 minutes. Therefore, to dry 6 towels, you would need 6 times as long, which is 6 x 20 minutes = 120 minutes or 2 hoursTags: None
- Home
- News & Features
- First Timers
- IR35 / S660 / BN66
- Employee Benefit Trusts
- Agency Workers Regulations
- MSC Legislation
- Limited Companies
- Dividends
- Umbrella Company
- VAT / Flat Rate VAT
- Job News & Guides
- Money News & Guides
- Guide to Contracts
- Successful Contracting
- Contracting Overseas
- Contractor Calculators
- MVL
- Contractor Expenses
Advertisers
Contractor Services
CUK News
- ‘Subdued’ IT contractor jobs market took third tumble in a row in August Today 08:07
- Are CVs medieval or just being misused? Yesterday 05:05
- Are CVs medieval or just being misused? Sep 23 21:05
- IR35: Mutuality Of Obligations — updated for 2025/26 Sep 23 05:22
- Only proactive IT contractors can survive recruitment firm closures Sep 22 07:32
- How should a creditors’ meeting ideally pan out for unpaid suppliers? Sep 19 07:16
- How should a creditors’ meeting ideally pan out for unpaid suppliers? Sep 18 21:16
- IR35: Substitution — updated for 2025/26 Sep 18 05:45
- Payment request to bust recruitment agency — free template Sep 16 21:04
- Why licensing umbrella companies must be key to 2027’s regulation Sep 16 13:55
Leave a comment: