Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:
You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.
Hi
On the back of this is it 40% at one client??
To expand
If I am working for 2 clients, both in London and close to one another but only doing 20% at 1 and 30% at another.
Does that count as 50% in one location (as they are both close to one another and there is no change to my travel)
or it is per contract?
I read somewhere that location is everything!!!
Take a look at the sticky. The first thing it says is worth remembering - "Not again"...
Hi
On the back of this is it 40% at one client??
To expand
If I am working for 2 clients, both in London and close to one another but only doing 20% at 1 and 30% at another.
Does that count as 50% in one location (as they are both close to one another and there is no change to my travel)
or it is per contract?
I read somewhere that location is everything!!!
The second link is an example in which someone only works two days a week, one at a temporary site that exceeds 24 months. Because it is more than 50% of working time, even though it is only one day a week, the 24 month rule applies.
I's not a hard and fast rule, merely HMRC's usual fuzzy description of the reality, but 40% of time worked is the way I read it: i.e. less than 60% on site.
I've got a temporary part time contract which starting to look like it might go beyond 24 months, however its pretty close to 40% depending on how you measure it. So is it 40% of 5 * 52, or 40% of days actually worked (which may be 6 * 52, less holidays), or something else?
Leave a comment: