******* contractors!!!
I've just spent most of this week trying to make what should be a small and simple change to an ETL process. A task which has been made almost completely impossible by the horrendous mess left behind by whoever initially built it.
A massively complicated data model, spaghetti SQL code and no ******* documentation or comments.
6 tables where 2 (at most) would do
over 4000 lines of code in a single procedure which if it had a half decent data model could be done in 500
I've just crossed the point where it would have been quicker for me to redo all his tulip in a proper manner
*****
I've just spent most of this week trying to make what should be a small and simple change to an ETL process. A task which has been made almost completely impossible by the horrendous mess left behind by whoever initially built it.
A massively complicated data model, spaghetti SQL code and no ******* documentation or comments.
6 tables where 2 (at most) would do
over 4000 lines of code in a single procedure which if it had a half decent data model could be done in 500
I've just crossed the point where it would have been quicker for me to redo all his tulip in a proper manner
*****
Comment