• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!

Email from agency 'requesting' a 10% rate reduction

Collapse
X
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

    #21
    I worked through Elan earlier this year and took a rate cut with them, but the email we rec'd was very different. It was a much simpler case of "take the cut or leave". The email OP has rec'd seems much woolier. I'd definitely mention it to ClientCo, and other contractors. I'd then reply and say ta, but no ta.
    Practically perfect in every way....there's a time and (more importantly) a place for malarkey.
    +5 Xeno Cool Points

    Comment


      #22
      I guess the story here is that Elan are in a financial pinch and should not be trusted with more than 7 days credit.

      PZZ

      Comment


        #23
        Bobco make damn good fishing tackle. They shouldn't need to cut contractor rates.

        Comment


          #24
          Bobco Limited and Enal will consider positively the flexibility you will demonstrate through accepting this change, in conjunction with the business requirements for the role at the time of your next contract renewal.
          So if you say NO then come renewal you ain't going to get it, blackmail?

          Although it doesn't say anything about a termination if you say no either. Why not offer to go direct with the client for 10% less than they're paying the agency, win-win situation for you both
          Brexit is having a wee in the middle of the room at a house party because nobody is talking to you, and then complaining about the smell.

          Comment


            #25
            Perhaps you could suggest keeping the hourly rate the same, but reduce the number of hours you do, to save the client the money. Alternatively offer to work on an ad-hoc basis, only working hours in the week where there is work to do (i.e. not a standard 40-hour week).

            Comment


              #26
              I work with one other contractor and we're the only two developers on this project - he started it 3 years ago and I joined about 18 months later. He got the work because he's a friend of the technical lead and when he first started he was invoicing Bobco (a large multinational) directly. It's only in the last two years that Bobco decided they wanted all contractors to go through Enal (incidentally the worst agency I've dealt with in 15 years of contracting).

              So neither of us were recruited by the agency - we both got our contracts and agreed our rates with the client before Enal got involved. This makes the fact that they're reducing our rates even more galling since Bobco could save a lot more than 10% by cutting the agency out and letting us go back to invoicing directly! This is something I plan to discuss with the project manager on Monday but I fear the company policy of forcing everyone to use the agency will win the argument.

              My colleague has already decided to accept the rate cut and do 10% less work and I'll probably end up doing the same.

              Still, I feel better now I've had a good rant on here. Thanks for all your replies

              Comment


                #27
                Originally posted by KentPhilip View Post
                Perhaps you could suggest keeping the hourly rate the same, but reduce the number of hours you do, to save the client the money. Alternatively offer to work on an ad-hoc basis, only working hours in the week where there is work to do (i.e. not a standard 40-hour week).
                I agree, well said.
                "A people that elect corrupt politicians, imposters, thieves and traitors are not victims, but accomplices," George Orwell

                Comment


                  #28
                  Elan actually fought for contractors during a mid contract rate reduction in a place I was at. The other agents just bent over so I have respect for Elan for doing that.

                  I got 'offered' a 15% rate cut at the start of the year in a financial, I walked but was explicitly clear to both client and agent my reasons for leaving and told them I would return when they offered me the existing rate. I took some time off, did another gig and now I am back at the financial for the same rate.

                  Comment


                    #29
                    Originally posted by KentPhilip View Post
                    Perhaps you could suggest keeping the hourly rate the same, but reduce the number of hours you do, to save the client the money. Alternatively offer to work on an ad-hoc basis, only working hours in the week where there is work to do (i.e. not a standard 40-hour week).
                    Won't work - the email says
                    Please be advised that Bobco Limited will not entertain any discussions around changes to other terms and conditions of your contract.
                    I would sit down with someone from the client and discuss it (without making it an enquiry, of course) and see exactly what the situation is. I'd also try to find out what kind of margin the agency is on - are they on a fixed fee (find me someone for £x) or a percentage of your rate?

                    Think about how much you want to stay there, whether you think you will get another role at the moment, how long could you survive without work. Then and only then will you know whether you should take the cut or not.

                    Personally, I'd only do the first half of that lot. Find out what the score is, then tell the agency where to stick their "offer". You'll find out how flexible they are when they have to bend over to stick it up their ****.
                    Best Forum Advisor 2014
                    Work in the public sector? You can read my FAQ here
                    Click here to get 15% off your first year's IPSE membership

                    Comment


                      #30
                      Can you just ignore the email, while asking questions at the client?
                      Originally posted by MaryPoppins
                      I'd still not breastfeed a nazi
                      Originally posted by vetran
                      Urine is quite nourishing

                      Comment

                      Working...
                      X