• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!

Green technology - am I bonkers ?

Collapse
X
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

    #31
    Originally posted by Diver View Post


    Offshore wind, wave and tidal power rules


    Er! I design the installation systems and methodology for the offshore renewable energy developments.

    You know it makes money for Diver
    Fixed it for ya!

    Comment


      #32
      Originally posted by Churchill View Post
      Fixed it for ya!
      Sussed!
      Confusion is a natural state of being

      Comment


        #33
        Worked on power stations. Tycemerc is right.

        If there was a major collapse of the grid it would be a real problem getting it all back up as power stations need lots of power to start up before they can generate anything, principally to run the umpteen megawatt pumps that feed the boiler. Some have gas turbines to provide the start up power but others need power from the grid, ie other stations. Many hours to start a station before you can start the next and so on. Tens of megawatts worth of steam just go to waste during the start up process.
        bloggoth

        If everything isn't black and white, I say, 'Why the hell not?'
        John Wayne (My guru, not to be confused with my beloved prophet Jeremy Clarkson)

        Comment


          #34
          Originally posted by Diver View Post


          Offshore wind, wave and tidal power rules


          Er! I design the installation systems and methodology for the offshore renewable energy developments.

          You know it makes sense
          Wow. Cool
          +50 Xeno Geek Points
          Come back Toolpusher, scotspine, Voodooflux. Pogle
          As for the rest of you - DILLIGAF

          Purveyor of fine quality smut since 2005

          CUK Olympic University Challenge Champions 2010/2012

          Comment


            #35
            Originally posted by xoggoth View Post
            Worked on power stations. Tycemerc is right.

            If there was a major collapse of the grid it would be a real problem getting it all back up as power stations need lots of power to start up before they can generate anything, principally to run the umpteen megawatt pumps that feed the boiler. Some have gas turbines to provide the start up power but others need power from the grid, ie other stations. Many hours to start a station before you can start the next and so on. Tens of megawatts worth of steam just go to waste during the start up process.
            Indeed.

            At Drax they had (may have updated them since) a couple of the engines that were used to power the English Electric Lightning interceptors for emergency use to run the station. It was a very interesting place to work and more impressive than the other power stations I used to visit.

            Comment

            Working...
            X