• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Collapse

You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:

  • You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
  • You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
  • If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.

Previously on "Importing from Word to Excel"

Collapse

  • blacjac
    replied
    Sounds like Wilmslow has fooked up and instructed the tester to do something stupid.

    Now just trying to sort it out before his boss finds out.......

    Leave a comment:


  • thunderlizard
    replied
    Originally posted by Wilmslow View Post
    There are two screens - one expected result per screen.
    umm...but if there are 2 screens shouldn't he have 2 tests, thus hitting that magic proportion of 1 expected result per test?

    Leave a comment:


  • Ardesco
    replied
    oh no do the poor dears have to hit ctrl+c and ctrl+v 15000 times each.... Let's be generous and give then 2 seconds for each key press..

    Still easily done in 2 days. Somebody needs to grow some balls and tell them to shut up and do it now or they aren't getting paid!!!
    Last edited by Ardesco; 11 September 2008, 09:50.

    Leave a comment:


  • Torran
    replied
    Originally posted by Wilmslow View Post
    That is 500 scripts, around 30 steps per script.

    He is playing hard ball - quoting 30 weeks to get this imported. As from a large consultancy they are trying to blag an extra resource at clients expense.

    Personally, I think that they should either:

    1. JFDI, there are two of them, they could lick this in a week.

    2. Speak to their superiors, and get some poor office admin temp to get it sorted.

    As a seasoned permie, I am wanting contractors to take headaches away from me, not to give me any more!
    Consultants to copy and paste. Genius! Name and shame!

    obviously you know they are ripping the p*sh. Sack em and get a £7 an hour temp to do it.

    Leave a comment:


  • Wilmslow
    replied
    Originally posted by Ardesco View Post
    Get the lazy fliper to do 500 copy/pastes so that both expected results are in the same box.

    Tedious work, but serves him right for being a twat in the first place...
    That is 500 scripts, around 30 steps per script.

    He is playing hard ball - quoting 30 weeks to get this imported. As from a large consultancy they are trying to blag an extra resource at clients expense.

    Personally, I think that they should either:

    1. JFDI, there are two of them, they could lick this in a week.

    2. Speak to their superiors, and get some poor office admin temp to get it sorted.

    As a seasoned permie, I am wanting contractors to take headaches away from me, not to give me any more!

    Leave a comment:


  • Ardesco
    replied
    Get the lazy fecker to do 500 copy/pastes so that both expected results are in the same box.

    Tedious work, but serves him right for being a twat in the first place...

    Leave a comment:


  • Wilmslow
    replied
    Originally posted by thunderlizard View Post
    How come there are 2 expected results per test? Is the first one the pass/fail, and then the software gets an extra merit mark if it passes the second one too?

    I'm no testing expert, but surely that's fundamentally naffed up!
    There are two screens - one expected result per screen.

    What amazed me is that the author asked me to customize Quality Center to cope with his two expected results!!

    Leave a comment:


  • BrilloPad
    replied
    Originally posted by thunderlizard View Post
    but surely that's fundamentally naffed up!
    the tests or Wilmslow?

    <<canned laughter>>

    Leave a comment:


  • thunderlizard
    replied
    How come there are 2 expected results per test? Is the first one the pass/fail, and then the software gets an extra merit mark if it passes the second one too?

    I'm no testing expert, but surely that's fundamentally naffed up!

    Leave a comment:


  • Wilmslow
    replied
    Originally posted by TonyEnglish View Post
    If you can do this manually why not use sendkeys? I did a routine yonks ago where I converted 600 technical drawings into another format using sendkeys - If all you are doing is things which you can do using the menu options in the application they work ok - once you have developed the script
    Not heard of Sendkeys - will take a google. Thanks.

    Leave a comment:


  • BoredBloke
    replied
    If you can do this manually why not use sendkeys? I did a routine yonks ago where I converted 600 technical drawings into another format using sendkeys - If all you are doing is things which you can do using the menu options in the application they work ok - once you have developed the script

    Leave a comment:


  • Wilmslow
    replied
    Originally posted by chef View Post
    are you simply taking 2 table cells in word and wanting to merge them into 1 via automation?

    how are you retrieving the data in the first place to the template?
    Okay, here goes......

    The test scripts in Word are manual scripts all using the same template. As the Word upload to QC is a pile of kack, we are then copying and pasting into Excel, and then using the mappings to upload to QC using the add-on utility.

    Word keeps hanging every time we tried it, so, we are sticking to Excel.

    Therefore, two sets of sutomation would be fantasia....

    1. Merge the two expected results into the one, in the Word test scripts

    2. An easy way to copy and paste from Word to Excel template ripe and ready for the upload into QC.

    The main sticking point is getting two cells in word merged for all tests, and not having to do this manually for all several thousand steps.

    I did think of using the utility mapping into QC, ,but, when you allocate the mapping, it loses the option of re-using it.

    Leave a comment:


  • blacjac
    replied
    Originally posted by blacjac View Post
    I'll do it for £100/hour
    Originally posted by Olly View Post
    I'll do it for £50 an hour....there you go. half price

    P.S. am smashing at Excel / Word automation using VBA
    Yeah but you'll take 3 times as long as me

    Leave a comment:


  • chef
    replied
    are you simply taking 2 table cells in word and wanting to merge them into 1 via automation?

    how are you retrieving the data in the first place to the template?
    Last edited by chef; 9 September 2008, 10:42.

    Leave a comment:


  • Olly
    replied
    I'll do it for £50 an hour....there you go. half price

    P.S. am smashing at Excel / Word automation using VBA