• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Collapse

You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:

  • You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
  • You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
  • If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.

Previously on "Scheduling (Job-Shop?)"

Collapse

  • moorfield
    replied
    Control-M, AutoSys worth looking at these are quite common in IBs for overnight sequential batch processing etc. Have a google.

    Leave a comment:


  • ControlG
    replied
    Thanks. I'll take a look at that.

    Now just started reading about "Constraint programming". Ideal Friday afternoon reading

    Leave a comment:


  • thunderlizard
    replied
    This one any good?

    http://www.ctg.albany.edu/publicatio.../workflow_mgmt

    Leave a comment:


  • ControlG
    started a topic Scheduling (Job-Shop?)

    Scheduling (Job-Shop?)

    I may be required to start and look at a scheduling system as part of my current contract. I acknowledge the complexities of this area and would like to familiarise myself more with the subject.

    I believe that the type of scheduling I will be faced with is commonly referred to as "job-shop scheduling". Each job must pass through a variety of processes. Some processes may take place at more than one location, there is a fixed duration for specified process and there is a transit time between processes. The tricky part is that the final process is continuous so the jobs must complete the penultimate process just in time for the final process in order to maintain its continuity.

    I've trawled the net and found many papers on the subject but all of which seem to assume a considerable amount of knowledge of the subject area as a prerequisite.

    Does anyone have any experience of such systems that could point me to a worthwhile text or other such resource.