• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!
Collapse

You are not logged in or you do not have permission to access this page. This could be due to one of several reasons:

  • You are not logged in. If you are already registered, fill in the form below to log in, or follow the "Sign Up" link to register a new account.
  • You may not have sufficient privileges to access this page. Are you trying to edit someone else's post, access administrative features or some other privileged system?
  • If you are trying to post, the administrator may have disabled your account, or it may be awaiting activation.

Previously on "An Interesting Project"

Collapse

  • fullyautomatix
    replied
    Aren't you better off asking in a train forum ? What sense does it make asking this in a contractor's forum ?

    Leave a comment:


  • threaded
    replied
    Originally posted by gricerboy View Post
    Wow! Great idea! I could then build a map of where the clicketty clacks occur all over the rail network and maybe sell it to Network Rail. My Lordz! I think I have a plan B!
    Already exists and you're about 30 years or so late.

    Leave a comment:


  • shaunbhoy
    replied
    Originally posted by gricerboy View Post
    Wow! Great idea! I could then build a map of where the clicketty clacks occur all over the rail network and maybe sell it to Network Rail. My Lordz! I think I have a plan B!
    Yes........a dynamic clickety-clack map. That would sell like hotcakes!!
    This time next year rodders!!

    Leave a comment:


  • gricerboy
    replied
    Originally posted by Durbs View Post
    Maybe GPS, start when you hear the first clickety clack, stop when no more clickety clacks / 66ft = approx clickety clack total.
    Wow! Great idea! I could then build a map of where the clicketty clacks occur all over the rail network and maybe sell it to Network Rail. My Lordz! I think I have a plan B!

    Leave a comment:


  • BolshieBastard
    replied
    Continuous rail is welded to form lengths up to several kilometers long. However, the quality of weld can make this an exceptionally quiet ride or, if not done so well, you can still 'feel' the joint in continuous rail as the wheels pass over them.

    I used to do the trans pennine route to Halifax until recently. The line is a mixture of continuous rail and old style 18m fishplate jointed line. In some places, the continous rail is almost bumpy as the fishplate stuff!

    Leave a comment:


  • Durbs
    replied
    Originally posted by gricerboy View Post
    so I was wondering if anyone knew of a more intelligent device that would register the clicketty clacks as we passed over them.
    I spent 6 months walking the West Coast mainline and various other places for a route clearance project measuring bridges and how far stuff was from the running line. We used a trundle wheel, clipboard and pencil. Now that WAS as good project. HTH.

    I also used to fix the datum plates to platforms (next time you are on a platform, look for the little white plates fixed to the platform wall by the track). That was also a good project if you didn't mind kneeling in trud-ridden bog roll.

    Maybe GPS, start when you hear the first clickety clack, stop when no more clickety clacks / 66ft = approx clickety clack total.

    Leave a comment:


  • gricerboy
    started a topic An Interesting Project

    An Interesting Project

    while I was undertaking my recent research travelling around the North West region I was struck by how much of the track wasn't put down to continuous rail and it led me to reconsider exactly what is continuous rail. On my daily commute from WSM to Swindon I hear the odd bit of clicketty clack even though the line is designated ad continuous rail. I thought it would be interesting to travel the whole length of the line from Bristol to Paddington and count hoe many joins there are in the track and compare the figure to other routes. The only problem is the process of doing the counting; I could use one of those things that they use on planes when they're doing a headcount but I don't trust myself to remain alert enough for the whole operation so I was wondering if anyone knew of a more intelligent device that would register the clicketty clacks as we passed over them.

Working...
X