Originally posted by Old Hack
View Post
Just an aside, once FITs are deemed too expensive to run any more and the turbines are eventually removed, who's going to pay for the removal of the thousands of tonnes of concrete require for the windmill bases?

Maintenance of new technology is always more costly until the period of reliability growth is achieved. Indeed current reliability monitoring of farms I'm working on is several times greater that of the national rail network. By comparison if we spent the cash we need to to operate an reliable rail network rail fares would be required to increase to a level where people might actually start rioting.