Watched an episode of this last night on More4.
Your bog standard IT consultants bought an asbestos riddled pile of tulipe, knocked it down & built a shiny new prefab.
Had all sorts of problems with water on the site, 3000 litres per week or more.
Reckoned that there was a spring.
Paid $AUD100k for remedial works, including a special $50k pipe to the council storm water drain.
Then someone discovered the major water main leak 50 yards up the road.![Rollin](https://forums.contractoruk.com/core/images/smilies/extras/rollin.gif)
Oooops.
Your bog standard IT consultants bought an asbestos riddled pile of tulipe, knocked it down & built a shiny new prefab.
Had all sorts of problems with water on the site, 3000 litres per week or more.
Reckoned that there was a spring.
Paid $AUD100k for remedial works, including a special $50k pipe to the council storm water drain.
Then someone discovered the major water main leak 50 yards up the road.