• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!

Rug Muncher

Collapse
X
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

    #21
    Christ their both at it now. and getting other kids to join in.

    New Labour Scenning W@nkers

    Rule Number 1 - Assuming that you have a valid contract in place always try to get your poo onto your timesheet, provided that the timesheet is valid for your current contract and covers the period of time that you are billing for.

    I preferred version 1!

    Comment


      #22
      Originally posted by TonyEnglish
      Christ their both at it now. and getting other kids to join in.

      New Labour Scenning W@nkers

      Yes, but Tone looks bemused, she looks besoted! (in both pictures at that)
      I am not qualified to give the above advice!

      The original point and click interface by
      Smith and Wesson.

      Step back, have a think and adjust my own own attitude from time to time

      Comment

      Working...
      X